Posted by Keith Landells on February 20, 2003 at 18:54:18:
I'd like to see if others agree with some of our thoughts on :
1. Ramps in a sub-controller. Even though a ramp is assigned to a selection of subs, like any CV, if the ramp is imbalanced the whole controller switches off. It is then possible to re-commission the subs not involved with the ramp. This seems inconsistent to me.
2. It is not possible to assign DVs to a sub-set of the sub-controllers. Hence, if we make a DV critical it switches the whole controller off, even though it may only affect 1 of the subs within the controller. It would be nice to assign the DV within Build to 1 or more subs, and use this to switch off parts of the controller if the critical DV is bad
Have we missed something ? I'd like to understand if there are issues we've missed.